All daily reports
Sent
Thursday, May 14, 2026
Harbor Medical Pavilion · prepared by T. Calloway (Super)
Trades on site
MEPDrywallCeiling gridFlooring
Work performed
OR suite 3 fitout continuing — medical gas rough-in approved. Ceiling grid set in west corridor. Sheet vinyl flooring installed in patient rooms 412–418.
Photo log
27 photos attached to this daily. Open the PDF above to view the full photo log with captions.