Harbor Medical Pavilion
Ask the spec
Get cited answers from your drawings & specs.
Open Q&A
New daily report
60-second voice memo → polished PDF.
Start a daily
New RFI
A photo and a note become an RFI.
Draft an RFI
Recent activity
last 8- 5d ago
Daily report filed by T. Calloway (Super)
84 crew · 27 photosOR suite 3 fitout continuing — medical gas rough-in approved. Ceiling grid set in west corridor. Sheet vinyl f
- 6d ago
RFI-118 — Medical gas outlet type at OR Suite 3
sentSent to HOK
- 6d ago
Daily report filed by T. Calloway (Super)
79 crew · 19 photosWall tile set in patient room wet walls 401–411. Painting continues in corridors. Med gas rough-in OR suite 2
- 7d ago
Daily report filed by T. Calloway (Super)
71 crew · 14 photosDoor frames set on 4th floor — patient rooms and back-of-house. Lead-lined door delivered for imaging suite. M
- 7d ago
OAC Meeting #41
OACApprove med-gas outlet substitution per RFI-118 response. Owner accepts Ohmeda quick-connect as compliant.
- 8d ago
Daily report filed by T. Calloway (Super)
54 crew · 8 photosIndoor work only — MEP rough-in on 5th floor, drywall hang on 4th. Site logistics slowed by rain.
- 9d ago
11 70 00 — Patient lift system
SubmittedMedEquip Partners
- 10d ago
RFI-117 — Imaging suite shielding — coverage extent
answeredSent to HOK
Latest daily report
Thursday, May 14, 2026
Weather
Sunny
Temp
62–78°F
Crew
84
Photos
27
OR suite 3 fitout continuing — medical gas rough-in approved. Ceiling grid set in west corridor. Sheet vinyl flooring installed in patient rooms 412–418.
Document library
BrowseTotal docs
6
Drawings
3
Specs
2
Pages indexed
2,754