Chalkline
JK
ProjectsHarbor Medical Pavilion
All daily reports
Sent

Monday, May 11, 2026

Harbor Medical Pavilion · prepared by T. Calloway (Super)

Weather

Rain, 58–68°F

Crew on site

54

Photos

8

Trades

2

Trades on site

MEPDrywall

Work performed

Indoor work only — MEP rough-in on 5th floor, drywall hang on 4th. Site logistics slowed by rain.

Photo log

8 photos attached to this daily. Open the PDF above to view the full photo log with captions.