All daily reports
Sent
Monday, May 11, 2026
Harbor Medical Pavilion · prepared by T. Calloway (Super)
Trades on site
MEPDrywall
Work performed
Indoor work only — MEP rough-in on 5th floor, drywall hang on 4th. Site logistics slowed by rain.
Photo log
8 photos attached to this daily. Open the PDF above to view the full photo log with captions.