All RFIs
RFI-042sent
Conflict between mechanical duct and beam at column line G/14
Created May 12, 2026To SHoP ArchitectsLevel 14, Grid G/14
Description
During MEP rough-in coordination, a conflict was identified between the 24x14 supply duct (M2.14) and the W18x40 beam at column line G/14. Routing per drawings shows the duct passing through the structural depth of the beam. Please advise on revised routing or beam penetration.
A/E response