Midtown Tower
Ask the spec
Get cited answers from your drawings & specs.
Open Q&A
New daily report
60-second voice memo → polished PDF.
Start a daily
New RFI
A photo and a note become an RFI.
Draft an RFI
Recent activity
last 8- 5d ago
Daily report filed by M. Reyes (Super)
47 crew · 18 photosConcrete pour completed on level 14 deck (slab edge to column line G). Steel erection continuing on levels 16–
- 5d ago
Toolbox Talk — Slab-edge fall protection — Level 14 deck pour
Toolbox TalkAll trades (Level 14)
- 6d ago
Daily report filed by M. Reyes (Super)
52 crew · 22 photosForms set for level 14 deck. Steel beams erected at level 17. Plumbing risers continuing.
- 6d ago
OAC Meeting #28
OACApprove revised mechanical routing on Level 14 pending detail from SHoP by 5/16.
- 7d ago
23 21 00 — Chilled water piping shop drawings
SubmittedCitywide Mechanical
- 7d ago
RFI-042 — Conflict between mechanical duct and beam at column line G/14
sentSent to SHoP Architects
- 7d ago
Daily report filed by M. Reyes (Super)
38 crew · 11 photosConcrete pour postponed due to morning rain. Indoor work continued — drywall and MEP rough-in.
- 9d ago
Pre-CO punch — Levels 3-4 corridors
Punch walk5 items · 4 open
Latest daily report
Thursday, May 14, 2026
Weather
Partly cloudy
Temp
58–72°F
Crew
47
Photos
18
Concrete pour completed on level 14 deck (slab edge to column line G). Steel erection continuing on levels 16–18. MEP rough-in proceeding floors 8–10. Drywall hanging on floors 3–4.
Document library
BrowseTotal docs
6
Drawings
3
Specs
2
Pages indexed
1,592