Northgate Distribution Center
Ask the spec
Get cited answers from your drawings & specs.
Open Q&A
New daily report
60-second voice memo → polished PDF.
Start a daily
New RFI
A photo and a note become an RFI.
Draft an RFI
Recent activity
last 5- 5d ago
Daily report filed by D. Olsen (Super)
22 crew · 11 photosSite mobilization complete. Erosion control installed. Mass excavation started in northwest quadrant. Crusher
- 6d ago
31 23 00 — Geotechnical engineer site-observation reports
SubmittedProGeo Engineers
- 6d ago
RFI-002 — Dock leveler quantity for west elevation
sentSent to Ware Malcomb
- 6d ago
Daily report filed by D. Olsen (Super)
18 crew · 6 photosStake-out of building pad complete. Survey verified to drawings. Pre-construction conference with subs at 2 PM
- 7d ago
RFI-001 — Mass excavation — unsuitable soil bearing
answeredSent to Ware Malcomb
Latest daily report
Thursday, May 14, 2026
Weather
Clear
Temp
50–70°F
Crew
22
Photos
11
Site mobilization complete. Erosion control installed. Mass excavation started in northwest quadrant. Crusher delivered for on-site material processing.
Document library
BrowseTotal docs
4
Drawings
2
Specs
1
Pages indexed
630